Each picture on separate page.
Before
June 11 90 degrees. Did not work very fast and did not have the Purdue help.
June 12 95 Drink plenty of water and work slow.
June 13 at 9 a.m. Even 6 to 9 in the morning was too hot but finished the East corner.
June 13 at 8 p.m. Hot evening
June 14 finished West corner.
June 14 evening. Finished
June 15 at 8 a.m. Ready for the backhoe
June 27 Ready for block. Second shot
June 28 Starting blocks
June 29 Foundation done